| Architectural Style |
Single story industrial warehouse |
| Year Built |
1980 |
| Building Base Area |
1,858.0 m2 |
| |
|
| Exterior |
|
| Foundation |
Poured Concrete |
| Walls |
Corrugated steel sandwich panels |
| Frame |
Steel |
| Roof |
Shallow pitch roof with corrugated metal covering |
| Insulation – Walls |
Fibreglass |
| Insulation – Roof |
Vinyl blanket |
| Windows |
Office area: Double steel sliders |
| |
Storage area: Translucent panels |
| Doors |
Individual doors: Nine metal faced/glazed doors in metal frames |
| |
Vehicular doors: Four metal panel overhead type doors |
| Chimney |
None |
| Fire Escape/Exterior Staircases |
None |
| Downspouts and Guttering |
Metal downspouts and guttering |
| Porches and Steps |
Two sets of concrete steps at front |
| Structural Repair |
Good |
| Paintwork |
Good |
 Top of page |
|
| |
|
| Interior |
|
| Basement |
None |
| |
|
| Ground Floor |
|
| Ground Floor – Receiving Offices |
|
| Floor |
Poured concrete |
| Walls (finish) |
Painted concrete block |
| Ceilings (finish) |
Suspended 'T' bar with acoustic tile |
| Doors and Trim |
Solid core doors with metal trim |
| Clear Height |
2.4 m |
| Ground Floor – Finished space |
|
| Floor |
Carpet and vinyl asbestos tile |
| Walls (finish) |
Painted concrete block and gyproc |
| Ceilings (finish) |
Suspended 'T' bar with acoustic tile |
| Doors and Trim |
Solid core/glazed doors with metal trim |
| Clear Height |
2.5 m |
| Ground Floor – Unfinished Space |
|
| Floor |
Poured concrete |
| Walls (finish) |
Metal siding |
| Ceilings (finish) |
Exposed insulating blanket |
| Doors and Trim |
Solid core doors with metal trim |
| Clear Height |
+- 5.4 m |
 Top of page |
|
| |
|
| Plumbing |
|
| Fixtures and Location |
one x 3 piece washroom |
| |
one x 2 piece washroom |
| |
One emergency shower and eyewash |
| Equipment |
40 gallon electric hot water heater |
| |
|
| Heating |
|
| Type of Furnace |
Steam heat supplied from central heat exchanger unit located on site |
| Type of Radiation |
Office Space: Baseboard heaters |
| |
Unfinished space: Overhead space heaters |
| Zoned Heating |
Office Space: Two zones |
| |
Unfinished Space: Separate controls for each (or for two) space heaters |
| Supplementary Heating |
None |
 Top of page |
|
| |
|
| Air-conditioning |
|
| Type of Air-conditioner |
None |
| |
|
| Electrical |
|
| Service Entrance |
600V, 225 Amps |
| Fixtures |
Office space: Fluorescent lighting |
| |
Unfinished space: Mercury vapour lighting |
| Equipment |
P.A. system throughout |
| |
|
| Sprinkler System |
|
| Type |
Wet charged system throughout |
 Top of page |
|
| |
|
| Fire Protection |
|
| Sensors |
None |
| Pull Stations |
None |
| Fire Alarm Panel |
None |
| Emergency Lighting |
'Chloride' battery units |
| |
|
| Elevators |
None |
| |
|
| Fixed Equipment |
|
| Type |
Two automatic dock levellers |
 Top of page |
|